Project participants
-
Building owner: University Hospital Basel
-
Architecture: Giuliani Hönger Architects, Zurich
-
Project management: Drees & Sommer Switzerland
-
Structural design: Lüchinger + Meyer Civil Engineers
-
Excavation support: Eberhard Bau AG
-
Anchor force measurement: Enertec Engineering AG
Key technical data
-
Investment volumeapprox. CHF 1.2 billion
-
Construction time2024-2042 (Phase 1: 2024-2033, Phase 2: 2035-2042)
-
Excavation pit26 m deep, 120,000 m³ excavation volume
-
Specialised civil engineering200 bored piles, 124 tonnes of steel reinforcement
Monitoring and security
Enertec Engineering AG supplied around 60 anchor load cells from the ELC series for monitoring anchor forces during excavation support. These were installed by the tensioning company and ensure structural safety during the construction phase.