Monitoring for the excavation pit at the Swiss Re Campus Mythenquai: Enertec Engineering AG ensures the stability of the steel injection ring with precise load cells.

Realised directly on Lake Zurich Swiss Re The new replacement building on Mythenquai is a project that places the highest demands on stability. The Steel wreathdeveloped and designed by Basler & Hofmannsecures the excavation pit and ensures stability during the dismantling work. In order to monitor the enormous forces in this system, the Enertec Engineering AG Highly precise Solid cylinder load cells type ZLD with capacities from 3,000 to 8,000 kN. These measuring systems provide continuous monitoring of the anchor forces and contribute to the safety of the work.

Cooperation between the construction companies Marti and Implenia during the shell construction work provides a solid basis for the project, while our measuring systems stabilise the crown and allow any risks to be identified at an early stage.

Your benefits with our monitoring technology:

Our systems provide precise and continuous data and support complex projects such as the one at Mythenquai reliably and securely.